Overall cost: £355,000.00
Location: Manchester
Project Brief:
Jennor UK were tasked with the following works:-
- Demolition of a section of non-loadbearing blockwork wall between units 5 & 6.
- Supply and install raised access floor on pedestals throughout the demise
- Core drilling through the floor slab to allow our M&E installation to be installed.
- Suspending the AHU in the basement refuse store & structural works in relation to openings of the basement blockwork walls for services to penetrate.
- Installation of large and new and exposed M. + E. Package throughout.
- New exposed A/C System
- The installation of a selection of new LED lighting pans throughout all areas.
- Installation of new W.C. Suite, Including Ladies Gents, and Disabled c/w new Suspended Ceilings and vinyl ceramic stone effect flooring.
- Construction of large open ended Kitchenette for staff use, inc. all wall, base units & white goods.
- Supply and installation of Komfort Polar Single Glazed partitions to office & meeting rooms inc. bespoke manifestations.
- Opaque manifestations installed to the outer office curtain wall screens to match the new internal scheme.
- Installation of bespoke Timber privacy screens to Reception.
- Installation of Solid core veneered timber doors with hardwood lipping throughout.
- Supply and install new carpets to office areas and Meeting Rooms, and new vinyl hardwood effect flooring to the kitchen and reception areas.
- Supply and installation of 3 No. privacy heavy curtains to meeting rooms.
- Supply and installation of all office furniture inc. new bespoke Reception Desk.
- Final Decoration throughout inc. specialist Murals.
The Result
So incredible was this fast track transformation in the highly constrictive timescale we had to work within, we received a letter of commendation from a Senior figure at ‘Grainger Plc.’ themselves, which was a wonderful and warmly received gesture. We revel in exceeding Client expectations and in delivering this incredible new workspace, we feel we’ve done just that!
What the client had to say:
What a fantastic job Jennor have done on the Clippers Quay (Salford Quays) Office Fit-out, it has received some great feedback.
Can I just say how impressed I am with the quality of the fit-out and your commitment to the project under such tight timescales and on-site challenges.
Big thank you to yourself, Gavin and Colin and the wider team operating in the background.
An absolute pleasure to work with, perfectly executed and a credit to you and your team so thanks again.
Jamie Hall MRICS
Development Manager